- Coating Sales
- Engineering
- Construction-related
Coating Sales
Coating Sales
We work closely with clients to deliver exactly the quantity of product they desire and at the right time, doing so at their target quality and budget and meeting their environmental concerns. We are equipped to propose brand new coatings, coating techniques, equipment, and processes for your workflow. We link business and people with each other in order to support the optimal develop of the coatings you seek.
Coating Sales Division
Paints and glazes |
|
||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Metal finishing agents | ・Metal cleaners ・Chemical cleaning agents ・Anti-rust agents ・Simple sandblasting devices | ||||||||||||||||||||||||||||||||
Paint application devices | ・Airless spray guns ・Air-based spray guns ・Static electric spray guns ・Static electric powder spray guns ・Binary mixture devices ・Conveyor devices for painting assembly lines ・Painting booths and related facilities |
||||||||||||||||||||||||||||||||
Measuring implements | ・Paint viscosity meters ・Film thickness meters ・Luminosity calculators ・Color difference calculators ・Hygrometers | ||||||||||||||||||||||||||||||||
Other | ・Painting booth disinfectants ・Fluorine resin treatment for painting booth goods ・Sandpapers ・Solvent cleanup devices ・Anti-microbial agent for painting booths |
Automotive Coatings
〈Customers' needs〉
Automobile paint finishes protect the vehicle from long-term exposure to harsh conditions like the weather. At the same time, a diverse offering of body colors serves to boost the perceived value of the vehicle.
Automobile paint falls into three categories: electrodeposited finishes, middle coatings, and top-layer finishes.
①Electrodeposited paint is an anti-corrosive paint. By submerging the vehicle body in electrodepositing paint the finish adheres to the vehicle. This process allows the paint to adhere to both inner and outer surfaces of the body and create an even glaze.
②The middle coat provides weather resistance, protects against chipping, and is also used to obtain a smooth coating. Solvent-based paints are the norm, but recently water-based paints have started to be used. The coat is usually applied through an electrostatic treatment.
③The top-layer coating is used to affix a wide range of colors to the body and determines its final hue. Recently, a variety of high-gloss materials have been developed and are used to enhance the appeal of the vehicle. As with middle coats, water-based paints have started to gain acceptance. The finish is usually applied electrostatically.
Our automobile paint finish production has recently adapted to to customers' demands for environmentally-friendly, energy-efficient/low-emissions paints.
〈Ueda Co., Ltd. provides〉
- 1.《Electro-deposited, value-added coatings》
Electrodeposition allows for maintaining a rust-proof coating while decreasing the amount of product required, all while achieving high workability and ease of use. We also offer other customized solutions such as thick film electrodeposition and eco electrodeposition. - 2.《Shorten work processes while remaining eco-friendly》
Not only can we offer water-soluble mid and topcoats, but also wet-on-wet solutions for mid and topcoating. These technologies render intermediate driers unnecessary. - 3.《Urethane coatings tailored to your needs》
Generally speaking, automotive components are made from plastic. We are poised to select and suggest the best coatings for these parts. For example, we can offer you water-soluble urethane coatings, metallic coatings, electrostatic coatings, and much more.
-
electrodeposited painting
-
meeting for appropriate color proposal
Architectural Machinery Coatings
〈Customers' needs〉
Construction machinery refers to those tools used when working with soil, wood, and other materials in building.
Such machinery includes power shovels, backhoes, bulldozers, and dump trucks for mining.
These tools are used from the smallest operations to enormous machines capable of carrying multiple tons at a time and are used in cities, mines, and construction sites. They also include eco-friendly hybrid machines and antipersonnel mine-clearing devices.
Each of these devices requires a paint job matching the company's signature color.
The key objective in painting them is to effect a bold, bright color that is visible under dangerous conditions or accidents. Different parts of the vehicle get a different treatment: the body frame is painted with an eye to anti-rusting and chipping resilience, while the inner cabin is painted with looks and endurance in consideration.
〈Ueda Co., Ltd. provides〉
- 1.《Reduced environmental impact》
Through the use of hybrid coatings, low temperature sintering powders, water-soluble coatings, and other eco-friendly products, as well as ones free of specific regulatory-controlled substances, we help you reduce your environmental footprint. - 2.《Increased quality》
By offering a range of products that span from urethanes, powders, sintered high-weather resistance coatings, epoxy-based high rust-proof coatings, and more, we increase the value of your products and ensure high resale value on the used car market.
In addition, we can drive further improvements to quality while maintaining productivity through the use of wet-on-wet urethane products. - 3.《Technical support for coating projects》
One way we help clients achieve increased productivity and quality at coating plants is the use of a core 3S system. We analyze current work processes and propose more efficient solutions, driving enhancements of your workflow, reducing waste and the need for recoating, as well as cutting down on manual cleanup and fixes in secondary processes.
-
paint line
-
Large excavator shovels for mines
-
Hybrid hydraulic excavators
Coatings for Precoated Metals
〈Customers' needs〉
One aspect of metal precoatings is the way they are applied with a roller before treating various chromed steel and aluminum plates. These are widely used in applications such as rooftop and wall coatings, home appliances, and audio/video equipment coatings.
There is growing demand for high design, specialized coatings like chromium-free environmentally-friendly items, as well as high-function products like thermal barrier coatings and stain-repellent ones, as well as coatings with pearl-like pigment.
〈Ueda Co., Ltd. provides〉
- 1.《Environmentally-aware primers》
Hexavalent chromium is widely used in a range of industrial products, but there is increased need today to reduce environmental impact by cutting down on the use of this material. We can offer chrome-free steel coatings that are free of hexavalent chromium and chromium compounds. - 2.《Coatings for reduced energy consumption and environmental impact》
One technique for preventing the “heat island” phenomenon and remaining eco-friendly is the use of coatings that include thermal barrier functionality to more efficiently repel solar radiation than traditional products. - 3.《Coatings that stay clean》
Achieve lasting waterproofing and wicking from the start, keeping the surface clean and stain-free. - 4.《A range of colors》
Clients today want high-designerly products that offer luxurious finishes like matte coatings. We offer high aesthetic coatings that include traditional aluminum based pigments, but also newer pearl-like pigments.
-
Computerized color matching
-
Three types of architectural siding
-
Coatings for precoated metals
Heavy Anticorrosive Coatings
〈Customers' needs〉
Roads and rail lines are a key economic base that support our country's growth. They are, in a word, the country's assets, and protection of those long-term assets is paramount.
Guidelines for steel bridge anti-rust solutions are decided by the government and based on careful parameters depending on the bridge makeup, construction method, building period, location, and other detailed data.
Our products have cleared all of these stringent guidelines and have also been developed with the strict needs of our customers at plants both in Japan and abroad.
〈Ueda Co., Ltd. provides〉
- 1.《Water soluble heavy anticorrosive coating systems》
We have finally entered an age in which high anti corrosive coatings are water soluble. We meet your needs for environmentally-aware coating systems by offering solutions like water-soluble epoxy resin undercoats, epoxy resin midcoats, polyurethane resin topcoats, and fluorocarbon polymer topcoats. - 2.《Heavy anti corrosive coating systems with reduced energy consumption》
This super eco-friendly coating system achieves greater durability than traditional methods, as well as reduces unnecessary processes for faster turnaround time. By combining low VOC/low solvent thick film flexible epoxy resin-based rustproof coatings and established under and topcoats, we achieve a highly eco-friendly system that is both environmentally aware and more cost-effective. - 3.《Achieve coating at 0 degrees Celsius》
The Public Works Research Institute has found in a survey of workability of coating systems in cold regions that these products allow for easy workability even in low temperature environments. We are poised to offer solutions like low temperature drying epoxy, flexible resin-based rustproof coatings, and various topcoating systems.
-
Cable-stayed bridges
-
Suspension bridges
-
Girder bridges
Architectural Coatings
〈Customers' needs〉
The buildings and apartments that make up the city skyline contribute to the city's appearance and support our active lifestyles. When buildings are newly built or overhauled, they require fresh paint jobs.
Painting these structures requires coatings that work with a range of surfaces, from steel and zinc plating to aluminum, as well as inorganic compounds like concrete and glass, and finally wood and other surfaces.
We are active in researching and developing products that not only meet the above cases, but also respond to a wide range of needs like eco-friendliness, climate change, natural resources protection, and conservation of building resources. We work daily to develop products that are robust in features but low-emissions and environmentally safe.
〈Ueda Co., Ltd. provides〉
Our motto is to be first to market and respond to developers', builders', and clients' needs in every way possible.
- 1.《Thermal insulation coatings for reduced energy consumption and environmental impact》
Using thermal barrier coatings to efficiently repel solar radiation helps block temperature rises on the surface of roofs. Curtailing temperature rises on the roof of a building helps reduce the internal temperature, thereby driving cost reductions of your HVAC system. We offer rooftop coatings that achieve this. - 2.《Stucco offered in a coating form》
Stucco is a uniquely high-function natural product that can be turned into a coating for application using a common brush or roller. Now you can achieve a stucco-like finish on large surfaces and do so at low cost and with ease. It was previously held almost impossible to produce coatings based on slaked lime, but that has now been achieved. Presenting high-function stucco coatings that are health- and eco-conscious. - 3.《Insect repellent coatings that keep pests at bay》
Applying this to interior walls and vinyl cloth surfaces ensures that any pests or unwanted insects simply stop at the surface, by causing an unpleasant feeling when they land. The insect-repellent agent has low toxicity to humans and animals and will not become airborne. It is perfectly safe for everyday use. Select from a clear or colored finish.
-
Optimized color suggestions
-
Roof coatings
Premium Coatings for Airport Terminals
Coatings for Steel Structures
Keep your buildings safe and sound for years to come through the use of long-term anticorrosive undercoats and super durable topcoats, as well as fire-retardant coatings with attractive finishes.
〈Product details〉
- Esco ST
JIS K 5551 Long-term interval - Unitect 30SF
High weather-resistant coatings and topcoats, reduced work time - Fire-retardant TECT
New flame retardant coatings for shortened work processes
Architectural Coatings (exterior, etc.)
Offering high weather resistance and low staining, this product maintains exterior walls in an attractive condition for the long term.
〈Product details〉
- Ales Aqua Cera Silicone
Super low staining water soluble acrylic silicone - Ales Aqua Fluorine Ⅱ
High weather resistant fluorocarbon polymers - Aqua Prism Method
Exposed concrete materials
Interior Coatings
We offer solutions like stucco coatings that have antiviral properties to ward off the flu and boast high odor-eating, as well as insect repellent coatings that keep pests at bay. These products allow you to maintain a climate that is safe and healthy.
〈Product details〉
- Ales Shikkui
Slaked lime, antiviral, antibacterial, antiodor, humidity regulating - Ales Insectproof Screens
Insect repellent coatings, prevention of infectious diseases and harmful pests - Aqua Zolacoat Ⅱ
High design, diverse coating products - Ales Eco Clean
Low VOC, multi-function water soluble coatings that are health-conscious
Architectural Coatings (for repairs, renovation, etc.)
Through the use of coatings that achieve long-term waterproofing to protect against external cracks, you can curb the decay of building exteriors while also maintaining the underlying armature, enjoying an excellent LCC.
〈Product details〉
- Ales Hold Method
JIS A 6909 Light Flexible Coating Material E - Ales Elastic Hold Method
JIS A 6909 Waterproof Multilayer Coating E
Sintered Coatings for Metal Architectural Materials
The use of high-quality sintered coatings on curtain walls and metal fittings achieves high durability and maintains them in an attractive fashion for years to come.
〈Product details〉
- Evaclad
Power coatings (fluorocarbon polymer, polyester resin) - Fukkaron
Thermoplastic fluorocarbon polymer coatings - Magicron for architectural use
Thermal barrier and insulating coatings
Thermal Barrier and Insulating Coatings
One of Kansai Paint’s unique and proprietary solutions is our double blocking system for rooftop thermal barrier coatings, which offers excellent blocking. Furthermore, insulating coatings offer excellent insulation that keeps spaces even in cold regions comfortably warm, and further reduces additional power consumption needs.
〈Product details〉
- Alescool
High durability rooftop thermal barrier coatings - CP Eco
Special reactive inorganic thermal barriers and insulation - Dream Coat
Waterproof material for protecting wet external insulation frames
Engineering
Ueda Co., Ltd. provides
Our team of engineers with vast experience and knowledge in paint and paint engineering will provide support in installation of paint equipment, production ramp up, and continuous process improvement in order to satisfy your requirements in quality, productivity, cost, lead time, and others.
Phase1 | Planning/ Presentation |
Create Presentation for Master Plan based on Customer's Requests |
---|---|---|
Phase2 | Master Planning | Establish quality, quantity, cost, estimated completion date and submit process planning, layout, and specifications for facilities |
Phase3 | Detailed Planning | Establish estimates and construction conditions and submit details including value analysis. |
Phase4 | Installation/ Adjustment |
Establish construction system and promote safe and swift construction while providing individual/exclusive schedule adjustment |
Phase1 | Setting Basic Conditions | Verify basic production conditions including production volume, number of product variations, product shapes, etc. in order to determine quality standard |
---|---|---|
Phase2 | Setting Conditions / Confirming Quality |
Establish criteria for facilities, paint, and paint conditions based on production conditions and conduct test run. Confirm quality and implement corrective actions where required |
Phase3 | Production Ramp Up Planning | Verify readiness for production ramp up including documentation and training |
Phase4 | Pilot Production | Determine quality, equipment utilization, guarantee, and target cost |
Phase1 | Process Inspection/ Hearing |
Study current status by inspecting process and listening to custome |
---|---|---|
Phase2 | Activity Planning/ Presentation |
Identify process to be improved, method, schedule, target, and submit estimate |
Phase3 | Improvement Activities | Execute activities together with customer |
Phase4 | Verify Effects/ Preventive Actions |
Report the results, evaluate against target, implement on other applicable processes, and revise documentation |
Production Assistance (Toyota Production System Consulting)
A consultant who is well-versed in the Toyota Production System (TPS) over many years at Toyota Motor East Japan, Inc. provides assistance to achieve drastic improvement through reduced costs, increased productivity, and improved quality.
Consulting Basic Curriculum
1.TPS Classroom Training
2 Pillars of TPS
・Just-in-time
・Autonomation with a human element, etc.
2.Process Improvement
This improvement covers the production process to the distribution process.
(Achieving total improvement including suppliers.)
Past Achievements
1.Company A (Major construction machinery manufacturer)
Achieved improvement of all processes accompanying the basic curriculum.
2.Results
Reduced costs by 35 million yen/month in just 3 months.
Description of consultant activities
1.Implementation of TPS in the ordering facilities
TPS concepts were incorporated from the planning stage for when the painting facility receives an order from the customer.
(Consultant planning participation)
2.Cooperated in the planning of the customer’s new facility and renewal plan
Provided consultation from the initial stage of the customer’s new factory construction and renewal planning and cooperated with making specific proposals in accordance with TPS fundamentals.
・Layout
・Staff assignments
・Part placement locations, etc.
3.Activities within our company
As the leader the consultant conducts independent study at business offices.
・Set the minimum inventory quantity at a level that will not trouble the customers.
・Held regular management training (First-in first-out, through 5S, used motion analysis to reduce the time required for warehouse operations, etc.)
Experience in Painting Construction Facilities
Paint Facilities Construction Experience
2019
Construction Month | Industry | Paint Facilities/ Construction |
---|---|---|
Oct, 2109 |
Special vehicle | Painting equipment installation work |
Sep, 2019 |
Electrical machinery | Paint polishing booth |
Aug, 2019 |
Construction machine | Railroad crossing safety fence sliding device |
Aug, 2019 |
Construction machine parts | Powder correction booth installation |
Aug, 2019 |
Automotive parts | Additional painting equipment construction |
Jul, 2019 |
Construction machine parts | Fire-preventative damper |
Jun, 2019 |
Construction machine | Additional transport device safety measures |
May, 2019 |
Construction machine | Paint piping construction |
May, 2019 |
Construction machine | Two-liquid mixture device |
May, 2019 |
Light metal steel plate | Cleaning device repair |
May, 2019 |
Construction machine parts | Wet painting booth new construction |
May, 2019 |
Construction machine parts | Painting equipment installation |
Apr, 2019 |
Construction machine | Transport device safety measures |
Apr, 2019 |
Construction machine | Shot ball drop preventative measures |
Apr, 2019 |
Special vehicle | Booth installation construction |
Mar, 2019 |
Construction machine | Additional painting equipment construction |
Mar, 2019 |
Construction machine | New paint line construction |
Mar, 2019 |
Construction machine parts | Working machine painting equipment |
Mar, 2019 |
Construction machine parts | Drying furnace burner replacement |
Mar, 2019 |
Electrical machinery | Equipment maintenance |
Mar, 2019 |
Automotive | Electrostatic gun installation |
Feb, 2019 |
Construction machine parts | 3rd drying furnace construction |
Feb, 2019 |
Construction machine | High-pressure paint circulation system |
Feb, 2019 |
Construction machine | Preprocessing device system |
Feb, 2019 |
Construction machine | Paint conveyor transport device |
Feb, 2019 |
Construction machine | Painting equipment safety measures construction |
Jan, 2019 |
Agricultural machinery | Hanger expansion construction |
2018
Construction Month | Industry | Paint Facilities/ Construction |
Dec, 2018 |
Construction machine parts | 2nd drying furnace construction |
---|---|---|
Dec, 2018 |
Construction machine | Sandblasting equipment construction |
Nov, 2018 |
Construction machine parts | 1st drying furnace construction |
Nov, 2018 |
Construction machine parts | Ultrasound transducer replacement |
Nov, 2018 |
Construction machine parts | Robot painting line |
Nov, 2018 |
Electrical machinery | Equipment maintenance |
Nov, 2018 |
Special vehicle | Control panel maintenance work |
Oct, 2018 |
Construction machine parts | Fan replacement, duct renovation construction |
Oct, 2018 |
Automotive | Electrostatic gun installation |
Sep, 2018 |
Automotive parts | UF device installation |
Aug, 2018 |
Light metal steel plate | SST device |
Jul, 2018 |
Construction machine parts | Booth front expansion construction |
Jul, 2018 |
Construction machine | Electrostatic coating safety device |
May, 2018 |
Special vehicle | Renewal of diaphragm electrode and installation of ammeter |
Mar, 2108 |
Special vehicle | Glazing and drying furnace |
Feb, 2018 |
Construction machine parts | Drying furnace heater renewal construction |
Feb, 2018 |
Automotive parts | Additional painting equipment construction |
Jan, 2018 |
Automotive | Installation of two-liquid mixing equipment |
2017
Construction Month | Industry | Paint Facilities/ Construction |
---|---|---|
Dec, 2017 |
Automotive | Installation of two-liquid mixing equipment |
Oct, 2017 |
Electrical machinery | Installation of additional fixed guns |
Sep, 2017 |
Construction vehicles | Dry repair coating booths |
Aug, 2017 |
Construction vehicles | Automatic water supply devices for paint booths |
Aug, 2017 |
Automotive parts | Installation of burners for powder sintering |
Jul, 2017 |
Construction machinery | Coating line renovation |
Jul, 2017 |
Construction machinery parts | Installation of new simplified wet booths |
Jun, 2017 |
Construction machinery | Installation of large-format electro-depositing dryers |
May, 2017 |
Construction machinery | Coating line renovation |
May,2017 | Automotive parts | Renovation of large-format grill coating equipment |
Jan, 2017 |
Construction machinery | Relocation of two-liquid mixing equipment |
2016
Construction Month | Industry | Paint Facilities/ Construction |
---|---|---|
Dec, 2016 |
Construction machinery parts | Renovation of dry coating booth |
Oct, 2016 |
Construction machinery parts | Swapout of coating booth fans |
Sep, 2016 |
Automotive | Renovation of RO equipment |
Aug, 2016 |
Construction machinery | Installation of near infrared heaters |
Jul, 2016 |
Protective equipment | Installation of two-liquid mixing equipment |
Jul, 2016 |
Automotive | Electrostatic controller installation |
May, 2016 |
Automotive | Electrostatic controller installation |
May, 2016 |
Construction machinery | Installation of electrostatic coating equipment for components |
Apr, 2016 |
Construction vehicles | Dry repair coating booths |
Mar, 2016 |
Construction machinery | Swapout of RO film on RO device |
2015
Construction Month | Industry | Paint Facilities/ Construction |
---|---|---|
Nov, 2015 |
Construction machinery parts | Period inspection of coating equipment |
Oct, 2015 |
Construction machinery parts | Simplified inspection of coating robots |
Oct, 2015 |
Agricultural machinery | Inspection of coating equipment |
Sep, 2015 |
Electrical machinery | Powder coating equipment |
Sep, 2015 |
Construction machinery | Period inspection of two-liquid mixing equipment |
Sep, 2015 |
Construction machinery | Relocation of coating booths |
Jun, 2015 |
Construction machinery | Period inspection of burners |
Mar, 2015 |
Automotive parts | Swapout of warm water boilers |
Jan, 2015 |
Agricultural machinery | Renovation of conveyor belt chains |
2014
Construction Month | Industry | Paint Facilities/ Construction |
---|---|---|
Dec, 2014 |
Construction machinery | Small exterior surface coating robots |
Dec, 2014 |
Construction machinery | Removal of existing exterior coating robot |
Nov, 2014 |
Construction machinery parts | Exhaust duct renovation |
Nov, 2014 |
Construction machinery | Prevention of abnormal expulsion of product from airless pump used in medium-sized coating booth |
Nov, 2014 |
Construction machinery | Prevention of abnormal expulsion of product from low pressure pump used in medium-sized coating booth |
Oct, 2014 |
Construction machinery parts | Expansion of dry booths |
Oct, 2014 |
Construction machinery | Prevention of abnormal expulsion of product from low pressure pump used in large-format coating booth |
Oct, 2014 |
Construction machinery | Installation of tubing for medium-sized coating booth |
Oct, 2014 |
Construction machinery | Installation of tubing for large-sized coating booth |
Sep, 2014 |
Construction machinery | Small exterior surface coating robots |
Aug, 2014 |
Construction machinery parts | Restoration of drying path |
Aug, 2014 |
Construction machinery parts | Mounting of topcoat painting device |
Aug, 2014 |
Construction machinery parts | Mounting of texture coating device |
Jul, 2014 |
Construction machinery | Dry coating booth for Komatsu Myanmar |
2013
Construction Month | Industry | Paint Facilities/ Construction |
---|---|---|
Dec, 2013 |
Construction machinery parts | Two-component mixer set |
Nov, 2013 |
Construction machinery | Period inspection of powder coating line |
Oct, 2013 |
Construction machinery | Installation of coating intake device for medium-sized coating booth |
Aug, 2013 |
Construction machinery | Solvent recovery equipment |
Jun, 2013 |
Construction machinery parts | Exhaust duct renovation |
Jun, 2013 |
Construction machinery | Spraying equipment |
Apr, 2013 |
Construction machinery | Repair of coating booth ducts |
Mar, 2013 |
Construction machinery | Remodeling of medium-sized axle coating line to achieve energy savings |
Jan, 2013 |
Construction machinery | Remodeling of boom arm pressure coating device |
Jan, 2013 |
Construction machinery | Bull tractor two-liquid mixing equipment |
2012
Construction Month | Industry | Paint Facilities/ Construction |
---|---|---|
Dec, 2012 |
Construction machinery | Remodeling of large-sized axle coating line to achieve energy savings |
Nov, 2012 |
Construction machinery | Two-component mixer set |
Aug, 2012 |
Construction machinery | Remodeling of dryer for large-sized axle coating line |
Jul, 2012 |
Construction machinery parts | Electrostatic coating equipment |
Jun, 2012 |
Construction machinery parts | Maintenance of supply routes for frame line coating |
Jun, 2012 |
Construction machinery | Explosion-proof two-component mixing machines |
Mar, 2012 |
Construction machinery | Auxiliary cleansing thinner reduction equipment |
Feb, 2012 |
Construction machinery | Remodeling of coating equipment tubing |
Feb, 2012 |
Coating manufacturing | Air wrap coating sets |
2011
Construction Month | Industry | Paint Facilities/ Construction |
---|---|---|
Oct, 2011 |
Construction machinery | New construction of electrodeposition coating chamber external alarm communication equipment |
Sep, 2011 |
Construction machinery parts | New construction of paint cleaning equipment, booths, coating equipment, drying furnace |
Aug, 2011 |
Automobile | Installation of water-based electrostatic coating equipment |
Aug, 2011 |
Construction machinery | Renovation of paint booth duct |
Apr, 2011 |
Automobile parts | New construction of coating pre-cleaning equipment |
Mar, 2011 |
Construction machinery parts | New construction of coating pre-cleaning equipment |
2010
Construction Month | Industry | Paint Facilities/ Construction |
---|---|---|
Dec, 2010 |
Construction machinery | New construction of pathways between paint booths |
Nov, 2010 |
Construction machinery | New construction and installation of paint booth elevator |
Sep, 2010 |
Construction machinery | Periodic inspections and maintenance of electrostatic coating equipment |
Aug, 2010 |
Construction machinery | Remodeling of electrodeposition coating piping system |
Aug, 2010 |
Construction machinery parts | New construction and relocation of large-scale coating equipment |
Aug, 2010 |
Construction machinery parts | Complete new construction of powder coating line pre-treatment facilities, powder coating equipment, |
Aug, 2010 |
Construction machinery | Renovation of partition curtains between paint booths |
Aug, 2010 |
Construction machinery | New construction of air blast collection conveyer |
Jul, 2010 |
Automobile parts | Renewal of drainage system for electrodeposition coating equipment |
Jul, 2010 |
Agricultural machinery | Periodic inspections and maintenance of electrodeposition coating equipment |
Apr, 2010 |
Construction machinery | Installation of additional parts for electrodeposition coating equipment |
Apr, 2010 |
Automobile | New construction of water-based electrostatic coating equipment |
Mar, 2010 |
Construction machinery | New construction of complete exhaust system for welding machine |
Mar, 2010 |
Construction machinery | Construction to prevent erosion in paint pumping chamber |
Mar, 2010 |
Electric equipment | Periodic inspection and maintenance of electrodeposition coating equipment |
Mar, 2010 |
Construction machinery parts | Relocation of paint booths and new construction of coating equipment and facilities |
Mar, 2010 |
Construction machinery | New construction of welding exhaust ducts |
Mar, 2010 |
Construction machinery | Remodeling of electrodeposition coating equipment and updating software for control panel |
Feb, 2010 |
Construction machinery | Remodeling of electrodeposition coating pre-treatment facilities |
Jan, 2010 |
Electric equipment | Construction of deodorizing furnace and exhaust ducts |
Jan, 2010 |
Electric equipment | Maintenance of pre-paint treatment facilities |
Jan, 2010 |
Construction machinery | Installation of paint spill prevention system |
2009
Construction Month | Industry | Paint Facilities/ Construction |
---|---|---|
Dec, 2009 |
Automobile parts | New construction of booths and installation of coating equipment |
Dec, 2009 |
Electric equipment | Replacing parts for electrodeposition coating equipment |
Nov, 2009 |
Construction machinery | Relocation of extinguisher equipment |
Nov, 2009 |
Construction machinery | Relocation of coating line, relocation and installation of coating equipment |
Nov, 2009 |
Construction machinery | Relocation and new construction of paint booth pumps |
Nov, 2009 |
Construction machinery | Installation of complete large-scale coating equipment for middle and final coating |
Nov, 2009 |
Construction machinery | Complete new construction of large-scale electrodeposition coating equipment |
Nov, 2009 |
Construction machinery | Remodeling of mid-scale coating equipment paint booths and installation of coating equipment |
Oct, 2009 |
Construction machinery | Remodeling of large-scale coating equipment paint booths and installation of coating equipment |
Sep, 2009 |
Construction machinery | Construction of dry coating equipment and ducts |
Aug, 2009 |
Electric equipment | Maintenance of electrodeposition coating drying furnace |
May, 2009 |
Construction machinery | Installation of pumps and hoses for paint booths |
Paint Facilities Construction Experience in China
2017
Construction Month | Customer | Industry | Paint Facilities/ Construction |
---|---|---|---|
Nov, 2017 |
Kongo | Construction machinery parts | Relocation of coating equipment |
Sep, 2017 |
Changzhou Katsushiro Machinery Qingdao Co., Ltd. | Agricultural machinery | Construction of coating equipment and facilities |
2016
Construction Month | Customer | Industry | Paint Facilities/ Construction |
---|---|---|---|
Jun, 2016 |
Changzhou Katsushiro Machinery Co., Ltd. | Construction machinery parts | Coating equipment swapout projects |
2015
Construction Month | Customer | Industry | Paint Facilities/ Construction |
---|---|---|---|
Mar, 2015 |
Goh | Construction machinery parts | Expansion of coating line |
2014
Construction Month | Customer | Industry | Paint Facilities/ Construction |
---|---|---|---|
Oct, 2014 |
Itao Iron Works | Construction machinery parts | Construction of coating equipment and facilities |
May, 2014 |
Toyo Seitetsu | Construction machinery parts | Construction of coating equipment and facilities |
2013
Construction Month | Customer | Industry | Paint Facilities/ Construction |
---|---|---|---|
Sep, 2013 |
Jiangsu Nabtesco | Construction machinery parts | Remodeling of coating equipment with anti-explosive treatment |
Mar, 2013 |
Jiangsu Nabtesco | Construction machinery parts | Construction of coating equipment and facilities |
2012
Construction Month | Customer | Industry | Paint Facilities/ Construction |
---|---|---|---|
Jun, 2012 |
Futagawa Facturing Co., Ltd. | Construction machinery parts | Revamp of electrostatic coating equipment |
Apr, 2012 |
Topy crawlers | Construction machinery parts | Installation of simplified drying device with anti-explosive crawler |
Apr, 2012 |
Topy crawlers | Construction machinery parts | Installation of anti-explosive coating agent stirring tanks |
2011
Construction Month | Customer | Industry | Paint Facilities/ Construction |
---|---|---|---|
Dec, 2011 |
Komatsu Shantui Construction Machinery Co., Ltd. | Construction machinery | 2-Liquid mixing equipment for urethane |
Oct, 2011 |
Jining Shanxi Hydraulic Pipe Co., Ltd. | Construction machinery parts | Pre-treatment and coating equipment for hydraulic pipe |
Oct, 2011 |
Komatsu Changzhou Construction Machinery Co., Ltd. | Construction machinery | 2-Liquid mixing equipment for urethane |
Oct, 2011 |
Komatsu Changzhou Construction Machinery Co., Ltd. | Construction machinery | Electrostatic coating equipment |
Jun, 2011 |
Shanghai Nabo Hydraulic Co., Ltd. | Construction machinery parts | Decelerator cleaning and coating equipment |
Apr, 2011 |
Changzhou Katsushiro Machinery Co., Ltd. | Construction machinery parts | Large-scale frame coating equipment |
Mar, 2011 |
Komatsu Shantui Construction Machinery Co., Ltd. | Construction machinery | Electrostatic coating |
2010
Construction Month | Customer | Industry | Paint Facilities/ Construction |
---|---|---|---|
Sep, 2010 |
Komatsu (China) Investment Co., Ltd. | Construction machinery parts recycling | Large-scale paint booths |
Sep, 2010 |
Shuozhou Mining Equipment Maintenance Branch | Construction machinery parts recycling | Large-scale paint booths |
Sep, 2010 |
Komatsu Shantui Construction Machinery Co., Ltd. | Construction machinery | Electrostatic coating equipment |
May, 2010 |
Komatsu Shantui Construction Machinery Co., Ltd. | Construction machinerys | Electrostatic coating equipment |
May, 2010 |
Okamoto Yokohama (Suzhou) Machinery Co., Ltd. | Construction machinery parts | Electrodeposition coating equipment |
May, 2010 |
Komatsu Shandong Construction Machinery Co., Ltd. | Construction machinery | Complete system for stress test equipment |
2009
Construction Month | Customer | Industry | Paint Facilities/ Construction |
---|---|---|---|
Aug, 2009 |
Komatsu Shantui Construction Machinery Co., Ltd. | Construction machinery | Electrostatic coating equipment |
Apr, 2009 |
Komatsu Undercarriage China Corp. | Construction machinery parts | Quick drying equipment for crawler track |
Mar, 2009 |
Weifang Erchuan Machinery Co., Ltd. | Construction machinery parts | Electrostatic coating equipment |
Construction-related
Construction-related Business
Ueda & Co., Ltd. has expanded its business scope to include construction painting, construction repairs, installation of coating equipment, and other paint sales related fields, and has been providing services to wide range of customers including overseas locations.
Experience in Construction Work
SOBIG Co., Ltd., an affiliate company of Ueda & Co., Ltd., specializes in construction painting and provides painting services for airports, architecture (such as buildings, factories, hospitals and supermarkets), and bridges.